|
|
||||||||
|
Fig. 1. Photograph of the excavated soil from underneath the tension infiltrometer. Individual soil peds are clearly delineated. In the field, these soil peds were connected and part of a contiguous desert pavement surface. Once removed from the support of surrounding peds, they slumped to the position seen in this figure. Ring is 20 cm in diameter.
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |