Click on image to view larger version.

Fig. 1. (a) Total P and (b) percentage of P from fertilizer in soil sections collected at different distances from the point of fertilizer application. The percentage of P from fertilizer in each section (%Pf S14) was calculated as follows: %Pf Si = [(Pf)Si x Wi]/
i = 14 [(Pf)Si x Wi] where, i is the soil section (14), (Pf)Si and Wi are the concentration of fertilizer P and the soil weight of each section respectively. (Pf)Si is calculated by subtracting the P concentration of the untreated soil (236 mg kg1) from the concentration of the fertilized soil. Error bars represent standard errors of five replicates. LSD for fertilizer treatment x soil section was (a) 68 and (b) 1.3.