|
|
||||||||
|
Fig. 2. Rates of total CO2 production before and after rewetting. Carbon dioxide production was not monitored during the drying period, Day 11 to Day 13. Error bars represent ±1 standard error of the means (N = 4).
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |