|
|
||||||||
|
Fig. 8. Parameters inferred from the settlement of a Millville silt loam during wetting (030 and 6090 min) and drying (3060 and 90120 min) cycles: (a) observed and optimized axial strain and (b) drift coefficient according to the coalescence model.
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |