|
|
||||||||
|

Fig. 2. Sensor and temperature corrected period (PC) determined using Eq. [2] related to
G for all four soils at 25°C. There are three points from different runs for each soil
combination. The solid line represents the standard calibration supplied by the manufacturer. The dashed line the calibration for high EC (>0.3 S m-1) soils
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |