Fig. 7. Estimates of weighted mean electrical conductivity (EC) and exchangeable sodium percentage (ESP) for a pedon located 0.5 m above mean high water at the Hell Hook (HH) and Cedar Creek (CC) sites, developed using the sigmoidal chronofunction and three possible sea level rise scenarios