
Fig. 5. An arbitrary simulated trajectory from Eq. [8] with parameter values given by the average of the values for the 10 plots in the two data sets. The solid line is the corresponding deterministic model curve given by Eq. [1]. Time is measured in minutes since deployment, and the concentration is measured in µL L-1 N2O