
Fig. 3 The predicted and measured normalized sample variance
as a function of time elapsed from the start of the tracer application for each site. Here the predicted
values next to the curves are derived from Eq. [10]. Note that measured
values that were >1 were excluded from Site 2 on the second sampling date and from Site 4 and 5 on the last sampling date